Highway Projects

  • Home
  • Projects
  • Highway Projects
  • 1

    Length : 42.318 Kms
    Amount : 309.92 Cr

    Rehabilitation and Upgradation of NH-565 from existing Km 361/330 (Dornala T Junction) to Km 420/800 (Penchalakona junction) [Design Km.360.156 to Km. 402.468] to Two lane with paved shoulders in the state of Andhra Pradesh through Engineering, Procurement & Construction (EPC) Basis contract

  • 2

    Length : 78.100 Kms
    Amount : 234.25 Cr.

    Rehabilitation and upgradation of NH-43 (old NH-78) from (Old Ch. 245.000 to 331.000 km, New Ch. 245.000 to 323.100 km) (MP border/ CG border to Surajpur section) to two lanes with paved shoulders in the State of Chhattisgarh under Corridor Approach through EPC mode

  • 3

    Length : 14.400 Kms
    Amount : 264.52 Cr.

    Construction of Bypass to Vizianagaram Town of NH-43 (New NH-26) from Km 537/6 to Km.552.000 (Raipur to Vishakhapatnam Section) to 4 Lane in the State of Andhra Pradesh on EPC

  • 4

    Length : 67.920 Kms
    Amount : 176.29 Cr.

    Rehabilitation and Upgradation of NH - 42 (old NH-205) from Km. 134/000 (old chainage Km. 58/0) to Km. 202/050 (old chainage Km. 126/0) (Mudigubba to Anantapuram Dist. Border section) to two lanes with paved shoulders in the State of Andhra Pradesh under Corridor Approach plan on Engineering, Procurement & Construction (EPC) Basis Contract.

  • 5

    Length : 34.200 Kms
    Amount : 155.26 Cr.

    Widening and strengthening to two lanes with Paved shoulders including Geometrical Improvements from Km 491.000 to 525.200 of Raipur – Visakhapatnam section of NH-26 in the State of Andhra Pradesh on EPC mode

  • 6

    Length : 53.310 Kms
    Amount : 124.22 Cr.

    Rehabilitation and Upgradation of Khairagarh – Dongargarh - Tumdibod (MDR) (Length 53.310 Km.) in the State of Chhattisgarh. Group – B (Package No: 12)

  • 7

    Length : 37.650 Kms
    Amount : 112.93 Cr.

    Rehabilitation & Upgradation from km 18/350 to km 56/0 on Chittoor – Kurnool road of NH – 18 (New NH – 40) to two lane with paved shoulders in the State of Andhra Pradesh (Under EPC Mode)

  • 8

    Length : 32.150 Kms
    Amount : 100.31 Cr.

    Widening and Strengthening from Km 513/0 to 546/550 (Design Chainage Km 513/0 to 00Km 545/150) of Muddanur to Jammalamadugu Section of NH 67 to 2 lane with paved shoulder including 4 laning in 3.05 Km (542/100 – 545/150) in Jammalamadugu town section in the State of Andhra Pradesh under Corridor approach (aggregate length of 32.150 Km) under EPC mode of Contract.

  • 9

    Length : 33.148 Kms
    Amount : 83.75 Cr.

    Two Laning with hard shoulder of Durg – Dhamdha – Bemetara Road section from existing chainage km 0.000 to km 33.148 in the state of Chharrisgarh on EPC Mode

  • 10

    Length : 15.356
    Amount : 40.85 Cr.

    Two Laning with hard shoulder of Donganagarh – Chichola Road section from km 0.000 to km 15.356 in the State of Chhattisgarh on EPC mode

  • 11

    Length : 35.120 Kms
    Amount : 37.57 Cr.

    Output and Performance Based Road Contract for the Maintenance of Package-20 Roads in Kadapa District of Andhra Pradesh

  • 12

    Length : 21.600
    Amount : 28.45 Cr.

    Improvement to Mallela-Lavanur road from Km. 0/0 to 21/6 in Kadapa District, Andhra Pradesh

  • 13

    Length : 8.820 Kms
    Amount : 26.23 Cr.

    Formation of new road from Rayachoty-Vempalli road to IIIT West campus road from Km.0/0 to 8/820. Sub work Formation of 4 lane road from Km.4/200 to 8/820 in Kadapa Distrct, Andhra Pradesh

  • 14

    Length : 7.000 Kms
    Amount : 19.51 Cr.

    Formation of 4 lane road from Km.46/0 to 53/0 of Rayachoti -Vempalliroad (Via.,) Gandi to Vempalli (Working reach from Km.47/0 to 53/9) in Kadapa District, Andhra Pradesh

  • 15

    Length : 2.000 Kms
    Amount : 15.75 Cr.

    This project has been awarded by to our own Project and involves the following: Internal Road Works at Construction of Research Building Complex and Providing Infrastructure Facilities for IGCARL (phase 2) at Pulivendula, Kadapa District

  • 16

    Length : 16.600 Kms
    Amount : 12.08 Cr.

    Chittoor (R&B) Cicle – (R&B) Division, Madanapalli – Improvements to Vayalpadu – Gurramkonda Galiveedu Road from Km. 0/0 to 16/6 in Chittoor District, Andhra Pradesh

  • 1

    Length : 46.760 Kms
    Amount : 526.80 Cr.

    Rehabilitation and Upgradation of existing two-lane road to 4-lane with paved shoulders from km. 32/0 to 79/650 (design ch. 32+000 to ch.78+760) of NH-342 of Puttaparthi-Koduru section in Sri Satyasai district of Andhra Pradesh state under EPC for the year 2022-23

  • 2

    Length : 56.995 Kms
    Amount : 438.00 Cr

    Widening and Reconstruction of existing road to 4-lane from Km 56+400 to Km 120+300 (i.e., from B. Kothapalli Junction to Gorantla) (excluding Kadiri Bypass from Km 70+200 to Km 77+105) of NH-716G in the State of Andhra Pradesh on EPC mode under Annual Plan 2021-22